EWOR: 2009 Rimrock Trail 4W608 Work Day

Rimrock Trail 4W608 Work Day
Hosted by Eastern Washington Off Road / Graham Family Farm NW
Event called by Wade Kabrich AKA Waycrazy
Report by Clay Graham. Photos by Clay Graham / CegPics.com

On August 29th, 2009 we met up in Tieton at Waycrazy’s house.
We hooked up the Forest Service trailer and headed to Rimrock’s Trail 4W608.

At the 4W608 trail head near FS1200 the Forest Service had brought in some rock last year for volunteers to use for the mud holes on the trail.

  • The idea is to put bottoms on the deep mud holes on 4W608.
    Since the holes are getting too deep to drive through the trail has been getting wider and by-passes are being made.
    It is sad this trail may be closed because of all the damage users are continuing to do. We volunteered a day a year ago to help keep this trail open. We added many loads of rock to the first sets of holes.
    On Saturday we volunteered to help another day on 4W608.
    The rock we added the year before was buried from people making the mud holes wider just to throw mud.
    The rock seemed to work where the holes did not get any deeper.

EWOR: 2009 Rimrock Trail 4W608 Work Day 1

Guido loaded the first load of rock.
EWOR: 2009 Rimrock Trail 4W608 Work Day 2

EWOR: 2009 Rimrock Trail 4W608 Work Day 3

EWOR: 2009 Rimrock Trail 4W608 Work Day 4

EWOR: 2009 Rimrock Trail 4W608 Work Day 5

Using Fish’s modified F250 to pull the Forest Service trailer, we were off to add more rock to the first mud hole.
EWOR: 2009 Rimrock Trail 4W608 Work Day 6

EWOR: 2009 Rimrock Trail 4W608 Work Day 7

Roller-Bear packing the rock.
EWOR: 2009 Rimrock Trail 4W608 Work Day 8

Looking back at the rock at the 4W608 trail head.
EWOR: 2009 Rimrock Trail 4W608 Work Day 9

We added another load to the first hole.

After getting loaded again we drove up the trail to the bad area of the trail.

Here we stopped to see where we where going to turn this big truck around to dump.
EWOR: 2009 Rimrock Trail 4W608 Work Day 10

Wow. We were real shocked to see what was mud hole after mud hole turned into one big mud bog.
This is 10 times as bad as it was a year ago.
EWOR: 2009 Rimrock Trail 4W608 Work Day 11

Four-running finding a lot of trash where people must have been out watching there buddies tear up the trail.
EWOR: 2009 Rimrock Trail 4W608 Work Day 12

Here we are back at the rigs with a plan.
EWOR: 2009 Rimrock Trail 4W608 Work Day 13

Moving up the trail.
EWOR: 2009 Rimrock Trail 4W608 Work Day 14

EWOR: 2009 Rimrock Trail 4W608 Work Day 15

We skipped over some holes to start on the real bad part.
EWOR: 2009 Rimrock Trail 4W608 Work Day 16

There was a wide by-pass so fish was able to get the truck and trailer turned around.
EWOR: 2009 Rimrock Trail 4W608 Work Day 17

EWOR: 2009 Rimrock Trail 4W608 Work Day 18

EWOR: 2009 Rimrock Trail 4W608 Work Day 19

EWOR: 2009 Rimrock Trail 4W608 Work Day 20

EWOR: 2009 Rimrock Trail 4W608 Work Day 21

EWOR: 2009 Rimrock Trail 4W608 Work Day 22

Here goes the first of many loads in the hole.
EWOR: 2009 Rimrock Trail 4W608 Work Day 23

EWOR: 2009 Rimrock Trail 4W608 Work Day 24

EWOR: 2009 Rimrock Trail 4W608 Work Day 25

Time to move the rock by hand to build a road.
EWOR: 2009 Rimrock Trail 4W608 Work Day 26

Down the hill for another load.
EWOR: 2009 Rimrock Trail 4W608 Work Day 27

Roller-Bear ran the tractor in the afternoon.
EWOR: 2009 Rimrock Trail 4W608 Work Day 28

EWOR: 2009 Rimrock Trail 4W608 Work Day 29

EWOR: 2009 Rimrock Trail 4W608 Work Day 30

There were some big rocks.
EWOR: 2009 Rimrock Trail 4W608 Work Day 31

Heading back up the trail.
EWOR: 2009 Rimrock Trail 4W608 Work Day 32

We had some problems with the hitch and had the trailer come off coming out of a hole.
We tightened the hitch some, put the trailer back on and we were on our way again.
EWOR: 2009 Rimrock Trail 4W608 Work Day 33

Guido and Four-running adding rock to some holes.
EWOR: 2009 Rimrock Trail 4W608 Work Day 34

Dumping in the big bog again.
EWOR: 2009 Rimrock Trail 4W608 Work Day 35

EWOR: 2009 Rimrock Trail 4W608 Work Day 36

EWOR: 2009 Rimrock Trail 4W608 Work Day 37

EWOR: 2009 Rimrock Trail 4W608 Work Day 38

We have a lot of work ahead.
EWOR: 2009 Rimrock Trail 4W608 Work Day 39

The kids running down the trail to go look for trash.
EWOR: 2009 Rimrock Trail 4W608 Work Day 40

Four-running and Guido building up the trail so the trailer can get farther in.
EWOR: 2009 Rimrock Trail 4W608 Work Day 41

Fatboy helping too.
EWOR: 2009 Rimrock Trail 4W608 Work Day 42

On the way back down the nut broke off the hitch ball.
Here is the trail fix.
EWOR: 2009 Rimrock Trail 4W608 Work Day 43

EWOR: 2009 Rimrock Trail 4W608 Work Day 44

We made it back to the trail head and got another ball on a mount.
Fish forgot his hitch key so we had to move the ball over. It was on tight.
EWOR: 2009 Rimrock Trail 4W608 Work Day 45

EWOR: 2009 Rimrock Trail 4W608 Work Day 46

EWOR: 2009 Rimrock Trail 4W608 Work Day 47

We finely were ready to load again.
EWOR: 2009 Rimrock Trail 4W608 Work Day 48

EWOR: 2009 Rimrock Trail 4W608 Work Day 49

Back at the mud bog we found a little frog. We moved it out of the hole so he wasn’t smashed.
EWOR: 2009 Rimrock Trail 4W608 Work Day 50

The guys worked on moving rocks to get the trailer in.
EWOR: 2009 Rimrock Trail 4W608 Work Day 51

Getting ready to dump.
EWOR: 2009 Rimrock Trail 4W608 Work Day 52

EWOR: 2009 Rimrock Trail 4W608 Work Day 53

EWOR: 2009 Rimrock Trail 4W608 Work Day 54

After the load was dumped the volunteers place the rocks so the trail was passable through this section.
It started to rain and we were burnt out. A group meeting to talk about calling it a day.
EWOR: 2009 Rimrock Trail 4W608 Work Day 55

The next two pictures will show how deep the hole was.
This picture was from before we started.
EWOR: 2009 Rimrock Trail 4W608 Work Day 56

After
EWOR: 2009 Rimrock Trail 4W608 Work Day 57

Back at the trail head Waycrazy had to move the rock back into the pile.
EWOR: 2009 Rimrock Trail 4W608 Work Day 58

This was Wrangler’s first trip to the trails.
She puked as soon as we hit the trail because of the bumps and then again later.
She had a good time running around with the kids.
EWOR: 2009 Rimrock Trail 4W608 Work Day 59

On this day we logged 80 volunteer work hours with the Forest Service.
Bill Kabrich volunteered 3 hours of his time transporting the tractor that Burrows Tractor let us use.
Thank you to Burrows Tractor and thank you to all that volunteered that helped out to keep 4W608 open.

Note:
Please do not spin your tires in the mud on the trails for fun.
Spinning tires for fun is one of the ways the mud holes start and hold water.
After the holes are started then others spin their tires trying
to get out of the mud holes and the mud holes grow into mud bogs.
Others make illegal by-passes to go around the mud holes.
Then the trail gets closed since it cost money to rebuild the trail.
Volunteers that work on these trails help to keep them open,
but on this trail the damage is growing faster than what is being fixed.
Tread Lightly!