EWOR: 2010 4W613 Trail Repair & Maintenance Day

4W613 Trail Repair & Maintenance Day
Hosted by Eastern Washington Off Road / Graham Family Farm NW
Report & photos by Clay Graham / CegPics.com

Around 10 AM Saturday August 28th, 2010 everyone met up at the Ahtanum Sno-park where the group was camped.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 1

Sno-park bunny.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 2

We headed up the Mid Fork across Darland and down to the Blue Lake trail where we stopped to fix the Darland Mt Sign.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 3

EWOR: 2010 4W613 Trail Repair & Maintenance Day 4

Crawl Mama decided it needed some white paint.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 5

EWOR: 2010 4W613 Trail Repair & Maintenance Day 6

We will have to come back and paint the brown part another day.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 7

Next we took a break at Blue Lake.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 8

We headed on up 4W615 and noticed someone had drove around the closed sign we put up at the bottom of a user made trail.
We drove up on top and saw the person ran over the closed sign near Blue Slide Lookout.
Some people do not respect the land or the volunteers that are trying to keep areas open.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 9

EWOR: 2010 4W613 Trail Repair & Maintenance Day 10

We moved on down FS1020 and onto 4W613.
At Foundation Meadow we added some water bars since the trail was being wash away.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 11

EWOR: 2010 4W613 Trail Repair & Maintenance Day 12

EWOR: 2010 4W613 Trail Repair & Maintenance Day 13

EWOR: 2010 4W613 Trail Repair & Maintenance Day 14

Woody packed the dirt with his YJ.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 15

EWOR: 2010 4W613 Trail Repair & Maintenance Day 16

EWOR: 2010 4W613 Trail Repair & Maintenance Day 17

Just into the trees we added another small water bar.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 18

EWOR: 2010 4W613 Trail Repair & Maintenance Day 19

EWOR: 2010 4W613 Trail Repair & Maintenance Day 20

EWOR: 2010 4W613 Trail Repair & Maintenance Day 21

EWOR: 2010 4W613 Trail Repair & Maintenance Day 22

And another trench to let the water run.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 23

EWOR: 2010 4W613 Trail Repair & Maintenance Day 24

On down we made a drain where where a log dam was blocking the Spring/Summer run-off.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 25

EWOR: 2010 4W613 Trail Repair & Maintenance Day 26

EWOR: 2010 4W613 Trail Repair & Maintenance Day 27

Once that work was finished we drove down to a bigger problem area.
Two stream crossings had to be rocked and the big mud hole blocked from use.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 28

We lucked out with the rock being so close to this crossing.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 29

Woody placed a big log into the mud hole with his YJ and with the help of others.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 30

The next stream crossing wasn’t as close to the rocks.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 31

EWOR: 2010 4W613 Trail Repair & Maintenance Day 32

EWOR: 2010 4W613 Trail Repair & Maintenance Day 33

[IMG]http:/easternwashingtonadventures.com/event-reports/2010/08/4W613-Work-Party/34.jpg[/IMG]

Down to fix the next mud hole. Volunteers worked to make the water flow.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 34

EWOR: 2010 4W613 Trail Repair & Maintenance Day 35

Looks like it will work for now.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 36

On down we had to cut a small log from the trail.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 37

Near the bottom of Foundation Ridge we had to clean out another log dam.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 38

EWOR: 2010 4W613 Trail Repair & Maintenance Day 39

EWOR: 2010 4W613 Trail Repair & Maintenance Day 40

EWOR: 2010 4W613 Trail Repair & Maintenance Day 41

We will have to bring more rock in at a later date.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 42

Off to the bottom to turn around at the Lower Meadow.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 43

Turning around at the Lower Meadow.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 44

EWOR: 2010 4W613 Trail Repair & Maintenance Day 45

EWOR: 2010 4W613 Trail Repair & Maintenance Day 46

EWOR: 2010 4W613 Trail Repair & Maintenance Day 47

Heading back up I stopped to get get some pics of the tight area near the cattle guard.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 48

EWOR: 2010 4W613 Trail Repair & Maintenance Day 49

EWOR: 2010 4W613 Trail Repair & Maintenance Day 50

EWOR: 2010 4W613 Trail Repair & Maintenance Day 51

Crawl Dad hooked his exocage on a tree and smashed the door.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 52

EWOR: 2010 4W613 Trail Repair & Maintenance Day 53

EWOR: 2010 4W613 Trail Repair & Maintenance Day 54

EWOR: 2010 4W613 Trail Repair & Maintenance Day 55

We headed on back to the Sno-park.
EWOR: 2010 4W613 Trail Repair & Maintenance Day 56

This was a fun work day we a lot accomplished.
Thank you to all who came out to help.

About Ceg

Photojournalist at CegPics.com
This entry was posted in Eastern Washington Off Road and tagged , , , , , , , , . Bookmark the permalink.